Test management
Important
terms:
Test
organization
Tester, test leader, test manager
Test planning and estimation
Test approach
Test progress
monitoring and control
Defect density, failure rate, test control, test monitoring, test report.
Configuration management
Configuration management, version control
Risk and testing
Risk, product risk, project risk, risk-based
testing
Incident
Management
Incident logging, incident management
1) Test organization
a) Test
organization and independence
The effectiveness of finding defects by testing and reviews can be
improved by using independent testers. Options for independence are:
Ø No independent testers. Developers test their own code.
Ø Independent testers within the development teams.
Ø Independent test team or group within the organization, reporting to
project management or executive management
Ø Independent testers from the business organization or user community.
Ø Independent test specialists for specific test targets such as usability
testers, security testers or certification testers (who certify a software
product against standards and regulations).
Ø Independent testers outsourced or external to the organization.
The benefits of
independence include:
Ø Independent testers see other and different defects, and are unbiased.
Ø An independent tester can verify assumptions people made during
specification and implementation of the system.
Drawbacks
include:
Ø Isolation from the development team (if treated as totally independent).
Ø Independent testers may be the bottleneck as the last checkpoint.
Ø Developers may lose a sense of responsibility for quality.
b) Tasks
of the test leader and tester
Test leader tasks
may include:
Ø
Coordinate the test strategy and plan with project
managers and others.
Ø
Write or review a test strategy for the project,
and test policy for the organization.
Ø
Contribute the testing perspective to other project
activities, such as integration planning.
Ø
Plan the tests – considering the context and
understanding the test objectives and risks –including selecting test
approaches, estimating the time, effort and cost of testing, acquiring resources,
defining test levels, cycles, and planning incident management.
Ø
Initiate the specification, preparation,
implementation and execution of tests, monitor the test results and check the
exit criteria.
Ø
Adapt planning based on test results and progress
(sometimes documented in status reports) and take any action necessary to
compensate for problems.
Ø
Set up adequate configuration management of
testware for traceability.
Ø
Introduce suitable metrics for measuring test
progress and evaluating the quality of the testing and the product.
Ø
Decide what should be automated, to what degree,
and how.
Ø
Select tools to support testing and organize any
training in tool use for testers.
Ø
Decide about the implementation of the test
environment.
Ø Write test summary reports based on the information gathered during
testing.
Tester
tasks may include:
Ø
Review and contribute to test plans.
Ø
Analyze, review and assess user requirements, specifications
and models for testability.
Ø
Create test specifications.
Ø
Set up the test environment (often coordinating
with system administration and network management).
Ø
Prepare and acquire test data.
Ø
Implement tests on all test levels, execute and log
the tests, evaluate the results and document the deviations from expected
results.
Ø
Use test administration or management tools and
test monitoring tools as required.
Ø
Automate tests (may be supported by a developer or
a test automation expert).
Ø
Measure performance of components and systems (if
applicable).
Ø Review tests developed by others.
Note: People who work on test analysis, test design, specific test types or
test automation may be specialists in these roles. Depending on the test level
and the risks related to the product and the project, different people may take
over the role of tester, keeping some degree of independence. Typically testers
at the component and integration level would be developers; testers at the acceptance
test level would be business experts and users, and testers for operational
acceptance testing would be operators.
c)
Defining skills test staff need
Now days a testing professional must have
‘application’ or ‘business domain’ knowledge and ‘Technology’ expertise apart
from ‘Testing’ Skills
2) Test planning and estimation
a) Test planning activities
Ø
Determining the scope and risks, and identifying
the objectives of testing.
Ø
Defining the overall approach of testing (the test
strategy), including the definition of the test levels and entry and exit
criteria.
Ø
Integrating and coordinating the testing activities
into the software life cycle activities: acquisition, supply, development,
operation and maintenance.
Ø
Making decisions about what to test, what roles
will perform the test activities, how the test activities should be done, and
how the test results will be evaluated.
Ø
Scheduling test analysis and design activities.
Ø
Scheduling test implementation, execution and
evaluation.
Ø
Assigning resources for the different activities
defined.
Ø
Defining the amount, level of detail, structure and
templates for the test documentation.
Ø Selecting metrics for monitoring and controlling test preparation and
execution, defect resolution and risk issues.
Ø Setting the level of detail for test procedures in order to provide
enough information to support reproducible test preparation and execution.
b)
Exit criteria
The purpose of exit criteria is to define when to stop testing, such as
at the end of a test level or when a set of tests has a specific goal.
Typically exit
criteria may consist of:
Ø Thoroughness measures, such as coverage of code, functionality or risk.
Ø Estimates of defect density or reliability measures.
Ø Cost.
Ø Residual risks, such as defects not fixed or lack of test coverage in
certain areas.
Ø Schedules such as those based on time to market.
c) Test estimation
Two approaches for the estimation of test effort are covered in this
syllabus:
- The
metrics-based approach: estimating the testing effort based on metrics of
former or similar projects or based on typical values.
- The
expert-based approach: estimating the tasks by the owner of these tasks or
by experts.
Once the test effort is estimated, resources can be identified and a
schedule can be drawn up.
The testing effort may depend on a number of factors, including:
- Characteristics
of the product: the quality of the specification and other information
used for test models (i.e. the test basis), the size of the product, the
complexity of the problem domain, the requirements for reliability and
security, and the requirements for documentation.
- Characteristics
of the development process: the stability of the organization, tools used,
test process, skills of the people involved, and time pressure.
- The
outcome of testing: the number of defects and the amount of rework
required.
d) Test approaches (test strategies)
One way to classify test approaches or strategies is based on the point
in time at which the bulk of the test design work is begun:
v Preventative approaches, where tests are designed as early as possible.
v Reactive approaches, where test design comes after the software or
system has been produced.
Typical
approaches or strategies include:
- Analytical
approaches, such as risk-based testing where testing is directed to areas
of greatest risk
- Model-based
approaches, such as stochastic testing using statistical information about
failure rates (such as reliability growth models) or usage (such as
operational profiles).
- Methodical
approaches, such as failure-based (including error guessing and fault-attacks),
experienced-based, check-list based, and quality characteristic based.
- Process-
or standard-compliant approaches, such as those specified by
industry-specific standards or the various agile methodologies.
- Dynamic
and heuristic approaches, such as exploratory testing where testing is
more reactive to events than pre-planned, and where execution and
evaluation are concurrent tasks.
- Consultative
approaches, such as those where test coverage is driven primarily by the
advice and guidance of technology and/or business domain experts outside
the test team.
- Regression-averse
approaches, such as those that include reuse of existing test material, extensive
automation of functional regression tests, and standard test suites.
Different approaches may be combined, for example, a risk-based dynamic
approach.
The selection of
a test approach should consider the context, including:
- Risk of failure of the project, hazards to the product and risks of
product failure to humans, the environment and the company.
- Skills and experience of the people in the proposed techniques,
tools and methods.
- The objective of the testing endeavour and the mission of the
testing team.
- Regulatory aspects, such as external and internal regulations for
the development process.
- The nature of the product and the business.
3) Test progress monitoring and control
a) Test progress monitoring
- Percentage of work done in test case
preparation (or percentage of planned test cases prepared).
- Percentage of work done in test environment preparation.
- Test case execution (e.g. number of test cases
run/not run, and test cases passed/failed).
- Defect information (e.g. defect density,
defects found and fixed, failure rate, and retest results).
- Test coverage of requirements, risks or code.
- Subjective confidence of testers in the
product.
- Dates of test milestones.
- Testing costs, including the cost compared to the
benefit of finding the next defect or to run the next test.
b) Test Reporting
- What
happened during a period of testing, such as dates when exit criteria were
met.
- Analyzed
information and metrics to support recommendations and decisions about
future actions, such as an assessment of defects remaining, the economic
benefit of continued testing, outstanding risks, and the level of confidence
in tested software.
Metrics should be collected during and at the end of a test level in
order to assess:
- The adequacy of the test objectives for that test level.
- The adequacy of the test approaches taken.
- The effectiveness of the testing with respect to its
objectives.
c) Test control
Test control describes any guiding or corrective actions taken as a
result of information and metrics gathered and reported. Actions may cover any
test activity and may affect any other software life cycle activity or task.
Examples of test control
actions are:
- Making
decisions based on information from test monitoring.
- Re-prioritize
tests when an identified risk occurs (e.g. software delivered late).
- Change
the test schedule due to availability of a test environment.
- Set
an entry criterion requiring fixes to have been retested (confirmation
tested) by a developer before accepting them into a build.
4) Configuration management
The purpose of configuration management is to establish and maintain the
integrity of the products (components, data and documentation) of the software
or system through the project and product life cycle.
For testing,
configuration management may involve ensuring that:
- All items of testware are identified, version controlled, tracked
for changes, related to each other and related to development items (test
objects) so that traceability can be maintained throughout the test
process.
- All identified documents and software items
are referenced unambiguously in test documentation
For the tester, configuration management helps to uniquely identify (and
to reproduce) the tested item, test documents, the tests and the test harness.
During test planning, the configuration management procedures and
infrastructure (tools) should be chosen, documented and implemented.
5) Risk and testing
a) Project risks
Project risks are the risks that surround the project’s capability to
deliver its objectives, such as:
Organizational factors:
- skill
and staff shortages;
- personal
and training issues;
- political
issues, such as
- problems with testers communicating their needs and test results;
- failure
to follow up on information found in testing and reviews (e.g. not
improving development and testing practices).
- improper
attitude toward or expectations of testing (e.g. not appreciating the
value of finding defects during testing).
Technical issues:
- problems
in defining the right requirements;
- the
extent that requirements can be met given existing constraints;
- the
quality of the design, code and tests.
Supplier issues:
- failure
of a third party;
- contractual issues.
b) Product risks
Potential failure areas (adverse future events or hazards) in the
software or system are known as product risks, as they are a risk to the
quality of the product, such as:
- Failure-prone software delivered.
- The potential that the software/hardware could
cause harm to an individual or company.
- Poor software characteristics (e.g.
functionality, reliability, usability and performance).
- Software that does not perform its intended
functions.
Risks are used to decide where to start testing and where to test more;
testing is used to reduce the risk of an adverse effect occurring, or to reduce
the impact of an adverse effect.
Product risks are a special type of risk to the success of a project. Testing
as a risk-control activity provides feedback about the residual risk by
measuring the effectiveness of critical defect removal and of contingency
plans.
A risk-based approach to testing provides proactive opportunities to
reduce the levels of product risk, starting in the initial stages of a project.
It involves the identification of product risks and their use in guiding test
planning and control, specification, preparation and execution of tests. In a
risk-based approach the risks identified may be used to:
- Determine the test techniques to be employed.
- Determine the extent of testing to be carried
out.
- Prioritize testing in an attempt to find the
critical defects as early as possible.
- Determine whether any non-testing activities
could be employed to reduce risk (e.g. providing training to inexperienced
designers).
Risk-based testing draws on the collective knowledge and insight of the
project stakeholders to determine the risks and the levels of testing required
to address those risks.
To ensure that the chance of a product failure is minimized, risk
management activities provide a disciplined approach to:
- Assess
(and reassess on a regular basis) what can go wrong (risks).
- Determine
what risks are important to deal with.
- Implement
actions to deal with those risks.
In addition, testing may support the identification of new risks, may
help to determine what risks should be reduced, and may lower uncertainty about
risks.
6) Incident management
Since one of the objectives of testing is to find defects, the
discrepancies between actual and expected outcomes need to be logged as
incidents. Incidents should be tracked from discovery and classification to
correction and confirmation of the solution. In order to manage all incidents
to completion, an organization should establish a process and rules for
classification.
Incidents may be raised during development, review, testing or use of a
software product. They may be raised for issues in code or the working system,
or in any type of documentation including requirements, development documents,
test documents, and user information such as “Help” or installation guides.
Incident reports
have the following objectives:
- Provide developers and other parties with feedback about the
problem to enable identification, isolation and correction as necessary.
- Provide test leaders a means of tracking the quality of the system
under test and the progress of the testing.
- Provide ideas for test process improvement.
Details of the
incident report may include:
- Date of issue, issuing organization, and author.
- Expected and actual results.
- Identification of the test item (configuration item) and
environment.
- Software or system life cycle process in which the incident was
observed.
- Description of the incident to enable reproduction and resolution,
including logs, database dumps or screenshots.
- Scope or degree of impact on stakeholder(s) interests.
- Severity of the impact on the system.
- Urgency/priority to fix.
- Status of the incident (e.g. open, deferred, duplicate, waiting to
be fixed, fixed awaiting retest, closed).
- Conclusions, recommendations and approvals.
- Global issues, such as other areas that may be affected by a change
resulting from the incident.
- Change history, such as the sequence of actions taken by project
team members with respect to the incident to isolate, repair, and confirm
it as fixed.
- References, including the identity of the test
case specification that revealed the problem.